Full plans approval is the most detailed and lowest risk way to apply for building control approval. It involves submitting comprehensive drawings and construction information before work begins, so we can assess your proposals against the building regulations.

Full plans approval helps identify and resolve these types of issues early, reducing the risk of delays or costly changes during construction.

You must submit a full plans application if either of the below apply.

  1. Fire safety regulatory reform (fire safety) order 2005, applies to non-domestic buildings (all commercial works), flats with shared areas, and mixed-use developments. Full plans allow fire safety measures to be reviewed through consultation with the fire service in detail before work starts.
  2. Building over or near public sewers requires agreement from Yorkshire Water

Application process

  • Submit your application with the plans and supporting documents.
  • The plans are assessed for compliance before works start.
  • Once your plans are approved, you will receive a formal decision notice confirming compliance (or outlining any requirements), giving you confidence to proceed with your project.
  • You will receive a decision within five weeks, or within another agreed timeframe. The outcome will be:
    • granted
    • granted with requirements
    • building plans application rejected
  • Your approval letter will list the site inspections required.

If planning permission is also needed, you must have this before starting work.

Timescales and validity

  • approval lasts for three years
  • you can start work two days after applying, but we recommend waiting until approval is confirmed
  • once the work is finished and meets regulations, you will receive a completion certificate within 8 weeks

Charges

Full plans applications are paid in two instalments

  1. plan fee (paid on submission)
  2. inspection fee (paid after works commence)

When there is an inspection fee the invoice will be sent to the client via email where an email address is provided.

Apply for building control approval (full plans)

Fill in our online form to submit a full plans application.

Clock It takes around 10 minutes to complete.

Paperclip To complete this form, you will need:

  • Your plans and construction specifications.
  • A location plan (scale 1:1250 or larger) showing:
    • the size and position of the building or extension
    • its boundaries and nearby buildings
    • any streets within the site boundary

If you don't already have a location plan, you can buy one from create location and block plans for planning and building control

Apply for building control approval with full plans

After you apply

  • We will check your submission and mark it as valid.
  • You will then receive an email with your application number and a request for payment.
  • Once payment is received, your application will be officially registered.