Application details
- Application number
- 2025/44/93383/W
- Last updated
- 18 May 2026
- Applicant
- Holroyd Homes
- Location
-
Hinchliffe Mill, Water Street, Holmbridge, Holmfirth, HD9 2NX
View application 2025/93383 on a map - Ward
- Holme Valley South
- Description / Development
- Discharge of details reserved by conditions 4 (design and appearance), 5 (archaeological investigation), 6 (boundary treatments), 9 (flood proofing), 10 (drainage scheme), 11 (flood routeing), 12 (temporary drainage scheme), 13 (lighting design strategy - biodiversity), 14 (Phase II Intrusive Site Investigation Report), 18 (electric vehicle charging), 19 (Construction Environmental Management Plan), 20 (highway retaining walls), 21 (surface water attenuation in highway), 22 (materials for retaining walls), 23 (Tree Protection Plan), 24 (Waste Management Plan), 25 (temporary waste arrangements), 26 (highway condition survey), 27 (re-surfacing scheme), 28 (parking layby scheme), 30 (CEMP: Biodiversity) and 31 (Landscape Ecological Design Strategy) of previous permission 2021/90800 for redevelopment and change of use of former mill site to form 19 residential units.
Agent details
- Agent
- Robert Halstead Chartered Surveyor
- Address
- Office G of H, Bridge Mills, Huddersfield Road, Holmfirth, HD9 3TW
Planning department details
- Case officer
- Victor Grayson
- Received
- 08 December 2025
- Validated
- 08 December 2025
- Initial target date
- 02 February 2026
- Decision date
- 09 April 2026
- Decision
- DISCHARGE OF CONDITION(S) SPLIT DECISION
- Appealed
- No
Since 1st August 2011 we haven't informed interested parties, objectors or supporters of applications, in writing or by site notice, of the relevant planning committee date.
Plans and drawings
Some documents may have been partially redacted for publication to remove personal details in accordance with the General Data Protection Regulation (GDPR).
Application (3)
- Covering letter [id 1134101] Size: 643KB 27/03/2026 - Deemed Discharge Notice
- Covering letter [id 1117237] Size: 364KB 08/12/2025 - Covering Letter
- Application Forms [id 1117137] Size: 329KB 08/12/2025 - Application Form Redacted
Consultation Responses (14)
- Consultee Responses [id 1139941] Size: 154KB 18/05/2026 - No additional annotation
- Consultee Responses [id 1136836] Size: 221KB 28/04/2026 - WY Archaeology Advisory Service
- Consultee Responses [id 1136052] Size: 53KB 21/04/2026 - KC Lead Local Flood Authority
- Consultee Responses [id 1134878] Size: 158KB 13/04/2026 - KC Lead Local Flood Authority
- Consultee Responses [id 1128429] Size: 65KB 26/02/2026 - KC Lead Local Flood Authority
- Consultee Responses [id 1127703] Size: 67KB 23/02/2026 - KC Environmental Health
- Consultee Responses [id 1126755] Size: 175KB 16/02/2026 - KC Highways
- Consultee Responses [id 1122797] Size: 40KB 22/01/2026 - KC Environmental Health
- Consultee Responses [id 1121517] Size: 53KB 13/01/2026 - KC Lead Local Flood
- Consultee Responses [id 1119619] Size: 41KB 24/12/2025 - KC Waste Strategy
- Consultee Responses [id 1117957] Size: 241KB 12/12/2025 - KC Ecology Unit
- Consultee Responses [id 1117956] Size: 217KB 12/12/2025 - WY Archaeology Advisory Service WY Archaeology Advisory Service
- Consultee Responses [id 1117955] Size: 161KB 12/12/2025 - KC Trees
- Consultee Responses [id 1117953] Size: 119KB 12/12/2025 - KC Highway Structures
Correspondence (1)
- Parish Council Comments [id 1122044] Size: 102KB 19/01/2026 - Holme Valley Parish Council
Decision (1)
- Delegated Report [id 1134585] Size: 507KB 09/04/2026 - Officer Report
Plans (32)
-
Proposed Site / Block Layout [id 1132232]
Size: 1.1MB
23/03/2026 - EV charging point and bin store layout rev P04
-
Proposed Site / Block Layout [id 1130822]
Size: 585KB
07/03/2026 - Flood Routeing Plan rev B
-
Plan General [id 1126146]
Size: 576KB
11/02/2026 - Surface Water and Foul Water Layout rev D
-
Plan General [id 1126143]
Size: 497KB
11/02/2026 - Surface Water and Foul Construction Drainage Plan rev B
-
Plan General [id 1125941]
Size: 436KB
10/02/2026 - Impermeable Area Plan
-
Plan General [id 1125937]
Size: 914KB
10/02/2026 - Surface Water and Foul Water Drainage Details rev B
-
Plan General [id 1117232]
Size: 1.8MB
08/12/2025 - Cond 31 - Proposed Hard Landscape Strategy
-
Proposed Landscaping Layout [id 1117231]
Size: 2.1MB
08/12/2025 - Cond 31 - Proposed Landscape Layout
-
Plan General [id 1117230]
Size: 165KB
08/12/2025 - Cond 31 - Proposed nesting boxes
-
Plan General [id 1117229]
Size: 3.2MB
08/12/2025 - Cond 31 - Proposed Soft Landscape Strategy
-
Plan General [id 1117228]
Size: 495KB
08/12/2025 - Cond 31 -Tree Pit Detail
-
Plan General [id 1117223]
Size: 446KB
08/12/2025 - Cond 4 - Window and Door Details
-
Plan General [id 1117221]
Size: 200KB
08/12/2025 - Cond 13 - Site Isolines 08
-
Plan General [id 1117220]
Size: 1.7MB
08/12/2025 - Cond 6 - Boundary Treatment Strategy
-
Plan General [id 1117219]
Size: 916KB
08/12/2025 - Cond 19 - CEMP Construction Logistics Plan
-
Plan General [id 1117207]
Size: 426KB
08/12/2025 - Cond 28 - Dam Head parking layby
-
Plan General [id 1117203]
Size: 402KB
08/12/2025 - Cond 13 - Lighting Layout Drawing - First Floor
-
Plan General [id 1117202]
Size: 411KB
08/12/2025 - Cond 13 - Lighting Layout Drawing - Ground Floor 01
-
Plan General [id 1117201]
Size: 263KB
08/12/2025 - Cond 13 - Lighting Layout Drawing - Ground Floor 02
-
Plan General [id 1117199]
Size: 235KB
08/12/2025 - Cond 13 - Site Isolines 04
-
Plan General [id 1117198]
Size: 224KB
08/12/2025 - Cond 13 - Site Isolines 05
-
Plan General [id 1117197]
Size: 221KB
08/12/2025 - Cond 13 - Site Isolines 06
-
Plan General [id 1117196]
Size: 200KB
08/12/2025 - Cond 13 - Site Isolines 07
-
Plan General [id 1117193]
Size: 363KB
08/12/2025 - Cond 6 - Hit and Miss Fence Detail
-
Plan General [id 1117156]
Size: 347KB
08/12/2025 - Cond 6 -1.2m Metal Estate Railing Detail
-
Plan General [id 1117155]
Size: 282KB
08/12/2025 - Cond 6 -Drystone Wall Detail
-
Plan General [id 1117154]
Size: 335KB
08/12/2025 - Cond 6 -Retaining Drystone Wall Detail
-
Proposed Landscaping Layout [id 1117147]
Size: 2.6MB
08/12/2025 - Cond 31 - Landscape and Ecological Design Strategy Layout
-
Plan General [id 1117142]
Size: 279KB
08/12/2025 - Cond 13 - Site Isolines 02
-
Plan General [id 1117141]
Size: 217KB
08/12/2025 - Cond 13 - Site Isolines 03
-
Plan General [id 1117140]
Size: 364KB
08/12/2025 - Cond 13 - Lighting Layout Drawing - Lower Ground Floor
-
Plan General [id 1117138]
Size: 538KB
08/12/2025 - Cond 13 - Site Isolines 01
Post Decision (1)
- Discharge of Conditions (Letters/Responses) [id 1134588] Size: 304KB 09/04/2026 - Discharge of Conditions Decision-Letter
Superseded Documents (15)
- Superseded Documents [id 1127474] Size: 562KB 19/02/2026 - EV charging and bin store plan rev P03
- Superseded Documents [id 1126145] Size: 537KB 11/02/2026 - Flood Routeing Plan rev A
- Superseded Documents [id 1126141] Size: 4.2MB 11/02/2026 - Drainage Conditions report rev C
- Superseded Documents [id 1125940] Size: 584KB 10/02/2026 - Surface Water and Foul Water Layout rev C
- Superseded Documents [id 1125939] Size: 487KB 10/02/2026 - Surface Water and Foul Construction Drainage Plan rev A
- Superseded Documents [id 1125938] Size: 424KB 10/02/2026 - Flood Routeing Plan
- Superseded Documents [id 1125936] Size: 4.2MB 10/02/2026 - Drainage Conditions report rev B
- Superseded Documents [id 1117247] Size: 2.6MB 09/12/2025 - Conds 10 and 11 - Drainage Assessment Report
- Superseded Documents [id 1117246] Size: 2.6MB 09/12/2025 - Cond 9d - Drainage Assessment Report
- Superseded Documents [id 1117222] Size: 1MB 08/12/2025 - Cond 18 - EV Charging Points and Bin Storage
- Superseded Documents [id 1117215] Size: 1.6MB 08/12/2025 - Cond 21 - Proposed Drainage Details
- Superseded Documents [id 1117214] Size: 609KB 08/12/2025 - Cond 21 - Proposed Surface Water and Foul Layout
- Superseded Documents [id 1117204] Size: 486KB 08/12/2025 - Conds 12 - Proposed Temporary Construction Drainage Plan
- Superseded Documents [id 1117144] Size: 1.6MB 08/12/2025 - Cond 10 - Proposed Drainage Details
- Superseded Documents [id 1117143] Size: 608KB 08/12/2025 - Cond 10 - Proposed Drainage Layout Plan
Supporting Information (24)
- General [id 1139914] Size: 235KB 24/04/2026 - Onsite Archaeology
- General [id 1134098] Size: 1016KB 02/04/2026 - Boundary treatments images
- General [id 1130821] Size: 4.2MB 07/03/2026 - Drainage Conditions report rev D
- General [id 1127384] Size: 569KB 19/02/2026 - Gas monitoring letter
- General [id 1125624] Size: 609KB 05/02/2026 - Remediation Strategy
- General [id 1117249] Size: 6.9MB 09/12/2025 - Conds 26 and 27 - Condition Survey and Remediation Statement
- General [id 1117248] Size: 8.5MB 09/12/2025 - Cond 14 - Phase 2 Geo-Environmental Report
- Tree / Arboricultural Survey [id 1117241] Size: 11.4MB 08/12/2025 - Cond 23 - Arboricultural Method Statement
- Conservation/Heritage Assessment [id 1117240] Size: 2.5MB 08/12/2025 - Condition 4 e - Heritage Architect Report
- General [id 1117239] Size: 956KB 08/12/2025 - Condition 5 - Archaeological Written Scheme of Investigation
- General [id 1117238] Size: 562KB 08/12/2025 - Cond 30 - CEMP
- Ecological/Biodiversity Statement [id 1117235] Size: 1.5MB 08/12/2025 - Cond 31 - LEDS
- Landscape Assessment [id 1117234] Size: 230KB 08/12/2025 - Cond 31 - Landscape Maintenance Schedule
- Landscape Assessment [id 1117233] Size: 209KB 08/12/2025 - Cond 31 - Landscape Management Plan
- General [id 1117226] Size: 747KB 08/12/2025 - Cond 4 - Materials Schedule
- General [id 1117225] Size: 2.9MB 08/12/2025 - Cond 4 - Window and Door Details 2
- General [id 1117218] Size: 178KB 08/12/2025 - Cond 19 - CEMP Written Document
- General [id 1117217] Size: 146KB 08/12/2025 - Cond 19 - Timetable
- Site Waste Management Strategy [id 1117216] Size: 82KB 08/12/2025 - Cond 19 i - Site Waste Management Plan
- General [id 1117210] Size: 747KB 08/12/2025 - Cond 22 - Materials Schedule
- General [id 1117209] Size: 174KB 08/12/2025 - Cond 24 - Permanent Waste Management Plan
- General [id 1117208] Size: 168KB 08/12/2025 - Cond 25 - Temporary Waste Management Plan
- General [id 1117205] Size: 146KB 08/12/2025 - Cond 31 j - Timetable
- General [id 1117139] Size: 362KB 08/12/2025 - Cond 13 - Luminaire Schedule
To measure distances in these
measure-enabled PDF plans, please see the
measuring instructions.
To view the plans and documents you need Adobe Reader installed on your computer.
Printing online plans and documents
Material which is downloaded or printed can only be used for information, e.g. so that comments can be made.
Further copies must not be made without the prior permission of the copyright owner.
Planning application documents are protected by section 47 of the Copyright, Designs and Patents Act 1988. Signatures, email addresses and the applicants phone number have been deleted for data protection reasons.
Ordnance Survey: © Crown copyright. All rights reserved. Kirklees Council. Licence No. 100019241, 2007