Application details
- Application number
- 2025/44/90659/E
- Last updated
- 04 July 2025
- Applicant
- Countryside Partnerships Yorkshire
- Location
-
Land at, Blue Hills Farm, Whitehall Road West, Birkenshaw, BD11 2DU
View application 2025/90659 on a map - Ward
- Birstall and Birkenshaw
- Description / Development
- Discharge of details reserved by condition 10 (foul and surface water drainage) on outline permission 2019/90527 for erection of up to 127 dwellings, with details of access
Agent details
- Agent
- Acanthus WSM Architects
- Address
- Studio 11, 2, King Charles Street, Leeds, LS1 6LS
Planning department details
- Case officer
- Katie Chew
- Received
- 10 March 2025
- Validated
- 10 March 2025
- Initial target date
- 05 May 2025
- Decision date
- 04 July 2025
- Decision
- DISCHARGE OF CONDITION(S) APPROVED
- Appealed
- No
Since 1st August 2011 we haven't informed interested parties, objectors or supporters of applications, in writing or by site notice, of the relevant planning committee date.
Plans and drawings
Some documents may have been partially redacted for publication to remove personal details in accordance with the General Data Protection Regulation (GDPR).
Application (1)
- Application Forms [id 1079300] Size: 331KB 11/03/2025 - ApplicationFormRedacted
Consultation Responses (3)
- Consultee Responses [id 1094071] Size: 37KB 01/07/2025 - KC_Lead_Local_Flood_Authority
- Consultee Responses [id 1082200] Size: 38KB 31/03/2025 - KC Lead Local Flood Authority
- Consultee Responses [id 1082048] Size: 176KB 28/03/2025 - No additional annotation
Decision (1)
- Delegated Report [id 1094675] Size: 180KB 04/07/2025 - Officer Report
Plans (12)
-
Drainage Plans [id 1093921]
Size: 4.2MB
28/06/2025 - 28765 SAT UK - A101 - A107 FLI - Attenuation Tank GA Details For Information 4
-
Drainage Plans [id 1093920]
Size: 787KB
28/06/2025 - 09.21011-ACE-00-ZZ-DR-C-1281 S115 SW Manhole Base Plan As Built C03
-
Drainage Plans [id 1093919]
Size: 2.2MB
28/06/2025 - 09.21011-ACE-00-ZZ-DR-C-1210 S104 Impermeable Area Plan (Phase 1) For Information P8
-
Proposed Site / Block Layout [id 1085632]
Size: 3.4MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1055_Drainage Strategy Sheet 1_For Information_P02
-
Proposed Site / Block Layout [id 1085631]
Size: 2MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1211_S104 Impermeable Area Plan (Phase 2)_For Information_P4
-
Proposed Site / Block Layout [id 1085625]
Size: 2.5MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1151_Land Drainage Sheet 2 of 2_For Information_C02
-
Proposed Site / Block Layout [id 1085623]
Size: 3MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1150_Land Drainage Sheet 1 of 2_For Information_C02
-
Proposed Site / Block Layout [id 1085621]
Size: 2.4MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1057_Drainage Strategy Sheet 3_For Information_P02
-
Proposed Site / Block Layout [id 1085620]
Size: 3.3MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1056_Drainage Strategy Sheet 2_For Information_P02
-
Proposed Site / Block Layout [id 1085612]
Size: 2.1MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-3201_External Levels - Sheet 2 (Phase 1)_For Information_C2
-
Proposed Site / Block Layout [id 1085608]
Size: 2.3MB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-3200_External Levels - Sheet 1 (Phase 1)_For Information_C2
-
Proposed Site / Block Layout [id 1085606]
Size: 573KB
29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1650_Phase 2 Attenuation Tank Sections_For Information_P1
Post Decision (1)
- Discharge of Conditions (Letters/Responses) [id 1094676] Size: 121KB 04/07/2025 - Discharge of Conditions Decision-Letter
Superseded Documents (19)
- Superseded Documents [id 1093916] Size: 343KB 28/06/2025 - 09.21011-ACE-00-ZZ-CA-C-0001 Blue Hills S104 Calcs Inc Phase 2 For Information P3
- Superseded Documents [id 1085634] Size: 342KB 29/04/2025 - 09.21011-ACE-00-ZZ-CA-C-0001_Blue Hills S104 Calcs Inc Phase 2_For Information_P2
- Superseded Documents [id 1085629] Size: 2MB 29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1210_S104 Impermeable Area Plan (Phase 1)_For Information_P7
- Superseded Documents [id 1085616] Size: 779KB 29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1281_S115 SW Manhole Base Plan_For Information_C02
- Superseded Documents [id 1079322] Size: 2MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1055 - Drainage Strategy Sheet 1
- Superseded Documents [id 1079321] Size: 2.4MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1056 - Drainage Strategy Sheet 2
- Superseded Documents [id 1079320] Size: 2.5MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1057 - Drainage Strategy Sheet 3
- Superseded Documents [id 1079319] Size: 786KB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1150 - Land Drainage Sheet 1 of 2
- Superseded Documents [id 1079318] Size: 2.9MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1151 - Land Drainage Sheet 2 of 2
- Superseded Documents [id 1079317] Size: 2.3MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1153 - Land Drainage - Phase 2
- Superseded Documents [id 1079316] Size: 779KB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1281 - S115 SW Manhole Base Plan
- Superseded Documents [id 1079315] Size: 2.4MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-3200 - External Levels - Sheet 1 (Phase 1)
- Superseded Documents [id 1079314] Size: 735KB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-3201 - External Levels - Sheet 2 (Phase 1)
- Superseded Documents [id 1079313] Size: 3.5MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-3605 - Attenuation Tank Section
- Superseded Documents [id 1079311] Size: 2.5MB 11/03/2025 - 28765 SAT UK - A101 - A107_FLI - Attenuation Tank GA Details
- Superseded Documents [id 1079310] Size: 3.4MB 11/03/2025 - Land Drainage Asset Maintenance Schedule - Land Drainage Asset Maintenance Schedule
- Superseded Documents [id 1079309] Size: 14.4MB 11/03/2025 - 09.21011-ACE-00-ZZ-RP-C-1000 - Flood Risk Assessment and Drainage StrategyPart-1
- Superseded Documents [id 1079303] Size: 12MB 11/03/2025 - 09.21011-ACE-00-ZZ-RP-C-1000 - Flood Risk Assessment and Drainage StrategyPart-2
- Superseded Documents [id 1079299] Size: 4.2MB 11/03/2025 - 09.21011-ACE-00-ZZ-DR-C-1021 - Overland Flow Routing
Supporting Information (5)
- Drainage / Foul Sewerage Assessment [id 1094351] Size: 343KB 02/07/2025 - 09.21011-ACE-00-ZZ-CA-C-0001-P3 Blue Hills S104 Calcs Inc Phase 2
- Drainage / Foul Sewerage Assessment [id 1085617] Size: 374KB 29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1310_S104 Foul Sewer and Surface Water Manhole Schedule (Phase 1)_For Information_C01
- Flood Risk Assessment [id 1085615] Size: 28.3MB 29/04/2025 - 09.21011-ACE-00-ZZ-RP-C-1000_Flood Risk Assessment & Drainage Strategy_For Information_P8
- Drainage / Foul Sewerage Assessment [id 1085605] Size: 351KB 29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1312_S104 Demarcation and Manhole Schedule (Phase 2)_For Information_P4
- Drainage / Foul Sewerage Assessment [id 1085604] Size: 420KB 29/04/2025 - 09.21011-ACE-00-ZZ-DR-C-1311_S104 Foul Sewer and Surface Water Demarcation Manhole Schedule (Phase 1)_For Information_P15
To measure distances in these
measure-enabled PDF plans, please see the
measuring instructions.
To view the plans and documents you need Adobe Reader installed on your computer.
Printing online plans and documents
Material which is downloaded or printed can only be used for information, e.g. so that comments can be made.
Further copies must not be made without the prior permission of the copyright owner.
Planning application documents are protected by section 47 of the Copyright, Designs and Patents Act 1988. Signatures, email addresses and the applicants phone number have been deleted for data protection reasons.
Ordnance Survey: © Crown copyright. All rights reserved. Kirklees Council. Licence No. 100019241, 2007