Application details
- Application number
- 2016/62/91757/W
- Last updated
- 14 December 2016
- Applicant
- 47a Limited
- Location
-
47A, Colne Road, Huddersfield, HD1 3AY
View application 2016/91757 on a map - Ward
- Newsome
- Description / Development
- Erection of extension to existing student complex to provide additional student accommodation and installation of 35Kw photovoltaic system on roof
Agent details
- Agent
- The Greg Cross Partnership
- Address
- 33, Summervale, Holmfirth, HD9 7AG
Planning department details
- Case officer
- Louise Bearcroft
- Received
- 26 May 2016
- Validated
- 06 June 2016
- Statutory consultation start date
- 17 Jun 2016
- Statutory consultation end date
- 08 Jul 2016
- Public consultation start date
- 06 June 2016
- Public consultation end date
- 02 July 2016
- Initial target date
- 05 September 2016
- Decision date
- 14 December 2016
- Decision
- CONDITIONAL FULL PERMISSION
- Appealed
- No
Since 1st August 2011 we haven't informed interested parties, objectors or supporters of applications, in writing or by site notice, of the relevant planning committee date.
Plans and drawings
Some documents may have been partially redacted for publication to remove personal details in accordance with the General Data Protection Regulation (GDPR).
Application (1)
- Application Forms [id 589029] Size: 89KB 31/05/2016 - No additional annotation
Consultation Responses (8)
- Consultee Responses [id 613799] Size: 47KB 29/11/2016 - No additional annotation
- Consultee Responses [id 610505] Size: 27KB 04/11/2016 - KC Environmental Health
- Consultee Responses [id 609398] Size: 179KB 28/10/2016 - Yorkshire Water
- Consultee Responses [id 609387] Size: 22KB 28/10/2016 - Environment Agency
- Consultee Responses [id 597781] Size: 54KB 02/08/2016 - Environment Agency
- Consultee Responses [id 596114] Size: 49KB 20/07/2016 - Highway Services
- Consultee Responses [id 595739] Size: 188KB 18/07/2016 - Yorkshire Water
- Consultee Responses [id 594229] Size: 120KB 07/07/2016 - 27/06/16 WY Police Architectural Liaison Officer
Correspondence (1)
- Acknowledgement Letter [id 589767] Size: 129KB 06/06/2016 - Standard Acknowledgement
Decision (1)
- Decision Notice [id 615872] Size: 136KB 14/12/2016 - Decision Notice Template
- About the Building Control service [PDF 197Kb]
Plans (6)
-
Proposed Elevations [id 613601]
Size: 617KB
29/11/2016 - No additional annotation
-
Proposed Floor Plans [id 613600]
Size: 707KB
29/11/2016 - No additional annotation
-
Proposed Site / Block Layout [id 613599]
Size: 1.8MB
29/11/2016 - No additional annotation
-
Proposed Floor Plans [id 609758]
Size: 773KB
01/11/2016 - Revised
-
Proposed Elevations [id 609757]
Size: 617KB
01/11/2016 - Revised
-
Location Plan [id 589214]
Size: 1MB
02/06/2016 - No additional annotation
Superseded Documents (4)
- Superseded Documents [id 589217] Size: 787KB 02/06/2016 - No additional annotation
- Superseded Documents [id 589216] Size: 435KB 02/06/2016 - No additional annotation
- Superseded Documents [id 589031] Size: 49KB 31/05/2016 - Seq & Exe Report.
- Superseded Documents [id 589026] Size: 114KB 31/05/2016 - No additional annotation
Supporting Information (21)
- Flood Risk Assessment [id 605746] Size: 8.4MB 03/10/2016 - No additional annotation
- General [id 589718] Size: 444KB 06/06/2016 - solar panels technical data
- Noise Assessment [id 589030] Size: 1.6MB 31/05/2016 - No additional annotation
- Design and Access Statement [id 589025] Size: 75KB 31/05/2016 - No additional annotation
- Contamination Report (Phase II/Ground) [id 588931] Size: 153KB 31/05/2016 - Phase 2 STU Index
- Contamination Report (Phase II/Ground) [id 588929] Size: 5KB 31/05/2016 - Phase 2 STU Address
- Contamination Report (Phase II/Ground) [id 588927] Size: 5.5MB 31/05/2016 - Phase 2 STU A13 HistSeg
- Contamination Report (Phase II/Ground) [id 588926] Size: 13KB 31/05/2016 - Phase 2 STU A Text
- Contamination Report (Phase II/Ground) [id 588925] Size: 3.4MB 31/05/2016 - Phase 2 STU A SiteSenSlice
- Contamination Report (Phase II/Ground) [id 588924] Size: 439KB 31/05/2016 - Phase 2 STU A SiteSenSeg
- Contamination Report (Phase II/Ground) [id 588922] Size: 4KB 31/05/2016 - Phase 2 STU A HistSliceList
- Contamination Report (Phase II/Ground) [id 588921] Size: 616KB 31/05/2016 - Phase 2 STU A Datasheet
- Contamination Report (Phase II/Ground) [id 588920] Size: 7.9MB 31/05/2016 - Phase 2 STU A HistSlice
- Contamination Report (Phase II/Ground) [id 588919] Size: 1.3MB 31/05/2016 - STU A Context
- Contamination Report (Phase II/Ground) [id 588918] Size: 845KB 31/05/2016 - Complete Phase 2 Initial Ground Report
- Contamination Report (Phase II/Ground) [id 588910] Size: 367KB 31/05/2016 - Phase 2- Coal Mining Report
- Flood Risk Assessment [id 588906] Size: 6.7MB 31/05/2016 - Flood Risk Assessement and Drainage
- Other Assessments [id 588903] Size: 6.3MB 31/05/2016 - Coal Mining Risk Assessment 1 of 3
- Contamination Report (Phase I/Desk) [id 588902] Size: 787KB 31/05/2016 - Phase 1 Desktop Study
- Other Assessments [id 588901] Size: 4.5MB 31/05/2016 - Coal Risk Assessement 3 of 3
- Other Assessments [id 588900] Size: 6.5MB 31/05/2016 - Coal Risk Assessement 2 of 3
To measure distances in these
measure-enabled PDF plans, please see the
measuring instructions.
To view the plans and documents you need Adobe Reader installed on your computer.
Printing online plans and documents
Material which is downloaded or printed can only be used for information, e.g. so that comments can be made.
Further copies must not be made without the prior permission of the copyright owner.
Planning application documents are protected by section 47 of the Copyright, Designs and Patents Act 1988. Signatures, email addresses and the applicants phone number have been deleted for data protection reasons.
Ordnance Survey: © Crown copyright. All rights reserved. Kirklees Council. Licence No. 100019241, 2007